Slr(2022)

Evaluate the project's sensitivity to flooding. Critical infrastructure generally requires planning for higher-impact, lower-probability scenarios.

Failure to curb emissions could lead to an additional 1.5 to 5 feet of rise by 2100. Step-by-Step Implementation Framework SLR(2022)

The Application Guide for the 2022 Technical Report recommends a structured approach for integrating these projections into local planning: Evaluate the project's sensitivity to flooding